SMR Gearbox Installation

SMR Gearbox Set up
Satisfactory overall performance is dependent upon right installation. lubrication and servicing. consequently it is necessary the instructions in the set up and maintenance leaflet. supplied with each and every gearbox. are followed cautiously. several of the vital facets of belt and torque-arm set up are listed below.
one. Install pulley on gearbox input shaft as near on the reducer achievable, and mount reducer on driven shaft as near to bearing as sensible. failure to carry out this will likely cause extra loads inside the input shaft bearings and output bearings and could lead to their premature failure.
2. Install motor and wedge belt drive with the belt pull at somewhere around 90° to your center line in between driven and input shafts. this will likely allow tensioning from the wedge belt drive with the torque arm which really should preferably be in stress. if output hub runs anti-clockwise. torque arm must be positioned the right.
3. lnstall torque-arm fulcrum on a rigid support to ensure that the torque-arm are going to be at around suitable angles towards the center line with the driven shaft and the torque arm situation bolt. make certain there may be adequate take up within the turnbuckle for belt tension adjustment.
Maintain near.
Bell drive may very well be located in any handy postion. when the torque arm is always to be made use of to tighten the belts, the drive need to be at about tight angle for the line among the input and output shafts.
Bell drive may be located for the suitable if wanted.
If output hub rotates clock-wise. position belt drive and torque arm in opposite direction to that shown in the illustration.
Torque arm and belt take up.
Torque arm can be mounted to your right if preferred.

Tags:

Recent Posts